Multi storey structural design chobham manor

PROJECT DESCRIPTION: This project comprises a large-scale Olympic Park regeneration project and Phase I of this development aims to deliver approximately 270 new homes SDS Limited was appointed by Corbyn Construction to design pre-cast vertical elements (columns, shear walls andwall panels) aimed at saving costs and accelerating the program. The client’s design engineers were initially opposed to any design alterations, however after explaining the benefits of the proposal, SDS obtained approval for the scheme. This project involved very close collaborations with a large engineering consultancy in the UK and presented challenges arising out of client/architectural design evolutions that required careful consideration. The overall value of the finished scheme is estimated to be approximately £64,000,000.

Long Street 10 storey building and basement

PROJECT DESCRIPTION: The structural design and detailed drawings for all vertical elements, columns, shear walls and wall panels. Our role involved analysis of the overall structure, design of the specific elements and liaison with the client’s design engineer to obtain approval.

Kings Crescent 12 storey apartment building with basement

PROJECT DESCRIPTION: The structural design and detailed drawings for all vertical elements, columns, shear walls and wall panels. Our role involved analysis of the overall structure, design of the specific elements and liaison with the client’s design engineer to obtain approval.